Belvedere – Staged Structural Design Process
Key Services
The Belvedere building, on 82 Majoribanks Street, Mt Victoria, was designed by one of Wellington’s prominent architects, Edmond Anscombe and constructed in 1937–38. It remains a strong example of high-density inner-city housing from the 1930s, notable for its early and practical inclusion of car garaging — a progressive feature at the time.
We were engaged to develop a staged structural design. This phased approach was adopted to provide greater cost control, enable more informed decision-making, and give the client clarity before committing to each subsequent stage of work.
Preliminary Design
- Sourced quotes for fire engineering, geotechnical, and architectural services.
- Met with sub-consultants on site and coordinated their inputs and deliverables.
- Updated the structural model to incorporate geotechnical parameters.
- Developed the conceptual design to a preliminary level, identifying primary structural elements and indicative locations of secondary components.
- Produced design mark-ups over existing CAD drawings.
- Held meetings with stakeholders to review the preliminary design outputs.
Developed Design
- Reviewed stakeholder feedback and revised the design where required.
- Progressed the design to developed design stage.
- Modelled floor diaphragm behaviour in the retrofitted structural state.
- Designed and detailed critical connections and secondary components.
- Prepared CAD drawings to developed design level.
- Met with stakeholders to present and discuss the developed design.
Detailed Design
- Incorporated final feedback and updated the design accordingly.
- Completed all documentation required for building consent, including detailed CAD drawings with structural connections and components.
- Coordinated with sub-consultants to finalise their packages for submission.
- Obtained quotes for peer review and responded to reviewer queries during the building consent process.