H&M, Tauranga Crossing

Interior & Fitout

Key Services

  • Detailed design of the seismic restraint for suspended ceiling system.
  • Detailed structural design of support beams and posts fixed into the existing base building to support glazing, roller shutters and glass sliding doors.
  • Prepared detailed structural drawings, design calculations, design feature report and PS1 as part of the building consent package.
  • Inspected and documented the installed structural works and worked with the project team to resolve any issues.
  • Prepared construction observation report with supporting inspection records and issued PS4 as part of the CCC package.
We use cookies on this website. Click to close.