Staged seismic retrofit at Henderson Youth Centre
Key Services
The Henderson Youth Facility building was assessed as earthquake-prone following the completion of Detailed Seismic Assessments (DSA) in 2018, with a subsequent revision undertaken in 2020. Our team was engaged to conduct a staged seismic strengthening design to minimise disruption to both staff and customers.
Initiation:
- Reviewed the previous Detailed Seismic Assessment calculations and results.
- Completed a survey of, and produced a report on, the secondary structural elements.
Developed Design:
- Conducted invasive and non-invasive investigations of selected elements.
- Collaborated with third-party contractors, including the KGA Geotechnical, Matthews & Matthews Architects, and Kwanto.
- Completed a seismic retrofit design to developed design stage.
- Designed secondary structural and non-structural elements, including seismic restraints.
Detailed Design:
- Progressed the developed design to detailed design stage.
- Responded to seismic retrofit RFIs from the external PS2 reviewer.
- Prepared structural drawings, design calculations, PS1, and DFR documentation for building consent and construction.
Tendering:
- Conducted site meetings with potential tenderers.
- Evaluated and interviewed tenderers.
Construction:
- Issued “for construction” drawings and reviewed sub-contractor shop drawings.
- Addressed site RFIs and completed construction monitoring (CM3) and inspection logs.
- Completed PS4 on completion, including the construction monitoring report.