The Henderson Youth Facility building was assessed as earthquake-prone following the completion of Detailed Seismic Assessments (DSA) in 2018, with a subsequent revision undertaken in 2020. Our team was engaged to conduct a staged seismic strengthening design to minimise disruption to both staff and customers.

Initiation:

  • Reviewed the previous Detailed Seismic Assessment calculations and results.
  • Completed a survey of, and produced a report on, the secondary structural elements.

Developed Design:

  • Conducted invasive and non-invasive investigations of selected elements.
  • Collaborated with third-party contractors, including the KGA Geotechnical, Matthews & Matthews Architects, and Kwanto.
  • Completed a seismic retrofit design to developed design stage.
  • Designed secondary structural and non-structural elements, including seismic restraints.

Detailed Design:

  • Progressed the developed design to detailed design stage.
  • Responded to seismic retrofit RFIs from the external PS2 reviewer.
  • Prepared structural drawings, design calculations, PS1, and DFR documentation for building consent and construction.

Tendering:

  • Conducted site meetings with potential tenderers.
  • Evaluated and interviewed tenderers.

Construction:

  • Issued “for construction” drawings and reviewed sub-contractor shop drawings.
  • Addressed site RFIs and completed construction monitoring (CM3) and inspection logs.